OldDawg
07-18-2007, 09:17 PM
Rumor Mill work in August 2007....
I've heard Detroit Local 636, has several blast furnaces to replace.
This work should start around the 13th with a 3 or 4 day cool down.
Similar past jobs generally work 7-12's, chances are this one will do the same.
For the straight, as always, call the hall.
PHONE: 248 538-6636
Check = 34.93 -3.00 Vacation
H&W = 7.73
Pen = 7.20
Nat Pen = 1.50
Fraternally, OldDawg
I've heard Detroit Local 636, has several blast furnaces to replace.
This work should start around the 13th with a 3 or 4 day cool down.
Similar past jobs generally work 7-12's, chances are this one will do the same.
For the straight, as always, call the hall.
PHONE: 248 538-6636
Check = 34.93 -3.00 Vacation
H&W = 7.73
Pen = 7.20
Nat Pen = 1.50
Fraternally, OldDawg